Design and construction of storm water systems for the city of Võru: Part 1 – Jüri Str; Part 2 – Liiva, Vee and Tartu Str



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

Jüri street pipeline – 323 m, Vee street quarter – 787 m. Boardwalk to Lake Tamula – about 100 m2, oil and sand interceptor with bypass ENS80/240, volumetric flow rate Qmax=230 l/s.

Client:
Võru Linnavalitsus (Võru City Government)
Name of the project:
Design and construction of storm water systems for the city of Võru: Part 1 – Jüri Str; Part 2 – Liiva, Vee and Tartu Str
Category:
Civil engineering
Type of construction:
Water and sewerage pipelines, storm water drain lines
Chief Designer:
Inseneribüroo Urmas Nugin OÜ
Description of work:
New building
Country:
Estonia
Address:
Jüri str, Liiva str, Vee str, Tartu str, Võru city
Beginning of the project:
2014
Year of completion:
2014