EE emergency reserve power plants, 110 MW and 140 MW



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

A total of four reinforced concrete buildings – two generator buildings and two control buildings, plus 110 kW and 330 kW substations, a tank farm of 14,000 m3, refuelling station and roads and lots.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Wärtsilä OY
Name of the project:
EE emergency reserve power plants, 110 MW and 140 MW
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
New building
Country:
Estonia
Address:
Tagamaa, Kirdalu village, Saku, Harjumaa
Beginning of the project:
2012
Year of completion:
2013