Electric power generation plant in Elektrėnai



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

The new block replaced the third and fourth blocks of Lithuania Power Plant, constructed in the 7th decade, increased the electricity production capacity, reliability and efficiency of Lithuania Power Plant, and reduced the electricity production cost. The project of Elektrėnai is already the second project employing “9FB” gas turbine technology provided by General Electric in the Baltic States. A similar device was installed in the course of extension of Riga Thermal Power Station-2 which is the largest power station in Latvia. Combined cycle (CC) technology is widely used in the European energy sector. Rigorous EU exhaust pollution standards were particularly advantageous in increasing fuel consumption efficiency in the area of electricity production. Many removed obsolete detrimental and surplus facilities were replaced namely with the fuel saving CC technology (its efficiency makes 50–60 per cent).

Client:
Lietuvos Energija AB
Name of the project:
Electric power generation plant in Elektrėnai
Category:
Civil engineering
Type of construction:
Power infrastructure
Architect:
V. Narkūnas
Description of work:
New building
Country:
Lithuania
Address:
Elektrinės str 21, Elektrėnai
Beginning of the project:
2010
Year of completion:
2012