Enefit-280 electrical supply of fuel feed systemAuvere village, Vaivara, Ida-Virumaa

Completion of the technical solution for medium voltage systems and low voltage main circuit in 2 substations. Installed capacity 8 MW.

Client:
Eesti Energia Õlitööstus AS (Eesti Energia Oil Industry)
Name of the project:
Enefit-280 electrical supply of fuel feed system
Category:
Civil engineering
Type of construction:
Power infrastructure
Designer:
Joala Elekter OÜ
Description of work:
New building
Country:
Estonia
Address:
Auvere village, Vaivara, Ida-Virumaa
Beginning of the project:
2011
Completion year:
2012
Characteristic feature:
Power lines of 12kV substation