IRU WTE high and medium voltage systemsPeterburi tee 105, Maardu, Harjumaa

The work involved the design and construction of the WTE plant’s 110 kV connection to Iru substation, and the delivery and implementation of a 110/10 kV 27.5 MW step-up transformer. In addition, 10 kV switchgear with seven bays, three transformers for the plant’s own use and the strong and weak-current connections between all equipment, including the plant’s generator, were designed, delivered and implemented. Ensuring compatibility of Iru’s new and old power plant proved a novel and complicated task.

Client:
CNIM
Name of the project:
IRU WTE high and medium voltage systems
Category:
Civil engineering
Type of construction:
Power infrastructure
Designer:
Merko Inrfa AS
Description of work:
New building
Country:
Estonia
Address:
Peterburi tee 105, Maardu, Harjumaa
Beginning of the project:
2011
Completion year:
2013
Characteristic feature:
Connection of waste incineration plant 110kV with 110/10kV transformer/10kV system - switchgear with 7 bays and 4 medium-voltage transformers