You are currently on group.merko.ee – AS Merko Ehitus page about the group.

Renovation of the Otepää water and sewerage networkOtepää

4,786 m of water pipelines;
3,051 m of sewerage pipelines;
1,408 m of pressurized sewerage;
7 waste water pumping stations, each one 5 l/s (18 m³/h);
renovation of 3 bore well pumping stations along with water treatment stations:
– Mäe water intake – water treatment station with a throughput of 110 m³/h, reservoirs 4×110 m³
– Kopli bore well pumping station – water treatment station with throughput of 20 m³/h
– Keskuse bore well pumping station – water treatment station with throughput of 20 m³/h

Client:
AS Otepää Veevärk
Name of the project:
Renovation of the Otepää water and sewerage network
Category:
Civil engineering
Type of construction:
Water and sewerage pipelines, storm water drain lines
Description of work:
Reconstruction
Country:
Estonia
Address:
Otepää
Beginning of the project:
2009
Completion year:
2010