Reconstruction of Aseri 110 kV substation with the merger of wind farmReeskalda 10, Aseri, Ida-Virumaa

Despite the poor condition of the old substation, the need for reconstruction was driven in the first place by the desire to integrate a wind farm. Since the delivery dates of more complicated devices for this project were 6–7 months, the working schedule was strenuous already from the very beginning. The technical design, for example, had to be ready by January 2008, C1T (first half of the substation) energized by August 2008 and C2T (second half of the substation) energized by October 2008. Works started with designing and ordering the equipment. Aseri substation was rather complicated also from the perspective of the secondary unit, because the networks of both Jaotusvõrk and Põhivõrk required connecting. The substation was handed over to the contracting entity on time and it is being used purposefully. Aseri substation is a good example that Merko has a competent and competitive team for building 110 kV substations.

Client:
OÜ Põhivõrk
Name of the project:
Reconstruction of Aseri 110 kV substation with the merger of wind farm
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
Reconstruction
Country:
Estonia
Address:
Reeskalda 10, Aseri, Ida-Virumaa
Beginning of the project:
2007
Completion year:
2008
Characteristic feature:
New switchgear of 110 kV with new control building