Renovation of Kuusalu 110kV substation



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

The works included the renovation of Kuusalu 110kV substation. The works were handed over to the client at completed form, i.e. “turnkey” method, where all the devices in the project are supplied with the necessary design works, installed, configured and tested. The old switchgear was demolished and there were built a new two-sectioned 110kV outdoor switchgear together with reconnecting the power lines and new control, auxiliary, and control system. Works included the reconstruction of access road, new control building, 110kV switchgear and communications booth.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Elering AS
Name of the project:
Renovation of Kuusalu 110kV substation
Category:
Civil engineering
Type of construction:
Power infrastructure
Chief Designer:
AS Merko Infra
Description of work:
Renovation
Country:
Estonia
Address:
Kuusalu, Harjumaa
Beginning of the project:
2017
Year of completion:
2018