Väo EJ 110 kV cable line with fiber-optic communication cableTallinn-Maardu-Rae

The 110 kV cable line connects Tallinn Power Plant with Iru 110 kV substation. What rendered the project unique was the installation of cable by way of directional drilling – drilling was accomplished from a depth of 8 m below the River Pirita and Peterburi mnt.

Client:
Digismart OÜ
Name of the project:
Väo EJ 110 kV cable line with fiber-optic communication cable
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
New building
Country:
Estonia
Address:
Tallinn-Maardu-Rae
Beginning of the project:
2007
Completion year:
2008
Characteristic feature:
Length of cable lines 4,200 m