Viru-Nigula Wind Farm 110 kV substation



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

In January 2007 Merko Ehitus finished construction works of the Viru-Nigula wind farm 110 kV substation, which included design, construction, installation, adjusting works and construction works of a control building. Construction works of the substation included installation of 3.1 km of 110 kV overhead power lines, construction of a control building and 110kV distribution board. For the first time in Estonia relay protection and automation means manufactured by an Austrian company, Sprecher, were used for building 0 110 kV substation. For Merko Ehitus, as the main contractor, it was the first project of high voltage substation. After experience in designing, constructing, adjusting and equipping such a “design-and-build contract” of a substation, Merko owns a qualified team that will be engaged in constructing substations in the future as well.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
OÜ Põhivõrk
Name of the project:
Viru-Nigula Wind Farm 110 kV substation
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
New building
Country:
Estonia
Address:
Tüükri village, Viru-Nigula, Lääne-Virumaa
Beginning of the project:
2005
Year of completion:
2007