You are currently on group.merko.ee – AS Merko Ehitus page about the group.

Water treatment plant of Kilingi-NõmmeKilingi-Nõmme, Pärnumaa

A fully automated drinking water treatment plant with 2 x 150 m³ tanks was built; 2 bore well pumping stations with automated systems were rebuilt, output of up to a max. 18 m³/hour; 1 waste water pumping station with automated systems; 635 m of pipelines between bore well pumping stations, water treatment plant and city public water supply system, 335 m of sewerage pipelines; a water tower no longer in use was demolished. The new plant was designed and built with the purpose of meeting the water consumption needs of 2,560 people.

Client:
Saarde Vallavalitsus (Saarde Municipality Government)
Name of the project:
Water treatment plant of Kilingi-Nõmme
Category:
Civil engineering
Type of construction:
Water treatment
Description of work:
New building
Country:
Estonia
Address:
Kilingi-Nõmme, Pärnumaa
Beginning of the project:
2012
Completion year:
2012
Characteristic feature:
Capacity 357 m3/day