- 4,786 m of water pipelines;
- 3,051 m of sewerage pipelines;
- 1,408 m of pressurized sewerage;
- 7 waste water pumping stations, each one 5 l/s (18 m³/h);
- Renovation of 3 bore well pumping stations along with water treatment stations:
Mäe water intake – water treatment station with a throughput of 110 m³/h, reservoirs 4×110 m³
Kopli bore well pumping station – water treatment station with throughput of 20 m³/h
Keskuse bore well pumping station – water treatment station with throughput of 20 m³/h
- Client:
- AS Otepää Veevärk
- Name of the project:
- Renovation of the Otepää water and sewerage network
- Category:
- Civil engineering
- Type of construction:
- Water and sewerage pipelines, storm water drain lines
- Description of work:
- Reconstruction
- Country:
- Estonia
- Address:
- Otepää
- Beginning of the project:
- 2009
- Year of completion:
- 2010