Wind farm infrastructure facilities in Šilalė



Location

Status

Time of completion

Other


Buildings
Civil engineering
Concrete works

Twelve wind turbines were planned. A contract signed with Merko statyba regarding both design and subcontracting, meaning that the company was responsible for both preparing the project and subcontracting. There were built substations for power transmission (transformer output 60 MW) and roads (total of about 8 km). In addition, 30 KV cable was installed (a total about 36 km).

Client:
UAB Šilalės vėjas
Name of the project:
Wind farm infrastructure facilities in Šilalė
Category:
Civil engineering
Type of construction:
Power infrastructure
Chief Designer:
UAB Archstudija, UAB Energetikos projektavimo institutas
Description of work:
New building
Country:
Lithuania
Address:
Laukuva village, Šilalė district
Beginning of the project:
2021
Year of completion:
2023