Twelve wind turbines were planned. A contract signed with Merko statyba regarding both design and subcontracting, meaning that the company was responsible for both preparing the project and subcontracting. There were built substations for power transmission (transformer output 60 MW) and roads (total of about 8 km). In addition, 30 KV cable was installed (a total about 36 km).
- Client:
- UAB Šilalės vėjas
- Name of the project:
- Wind farm infrastructure facilities in Šilalė
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Chief Designer:
- UAB Archstudija, UAB Energetikos projektavimo institutas
- Description of work:
- New building
- Country:
- Lithuania
- Address:
- Laukuva village, Šilalė district
- Beginning of the project:
- 2021
- Year of completion:
- 2023