As part of the procurement, the new current transformers at Balti substation were rebuilt, delivered and installed in place of the existing ones.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- Elering AS
- Name of the project:
- Replacement of 330kV power transformers in Balti substation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Chief Designer:
- AS Merko Infra
- Description of work:
- Renovation
- Country:
- Estonia
- Address:
- Elektrijaama road 29, Narva
- Beginning of the project:
- 2020
- Year of completion:
- 2020