The contract covers construction on the load-bearing structures underlying the railway at the Ülemiste joint terminal, which will be called the Linda terminal after a mythological character. In this phase, the concrete part of the underground level of the terminal and other necessary buried utility lines needed for the railway infrastructure will be completed.
The construction work will be shared 50/50 with Merko Ehitus Eesti, which is the lead partner.
- Client:
- Rail Baltic Estonia
- Name of the project:
- Construction works of Rail Baltica Ülemiste terminal railway facilities
- Category:
- Civil engineering
- Type of construction:
- Transportation
- Cooperation partner:
- KMG Infra OÜ
- Architect:
- Zaha Hadid Architects
- Chief Designer:
- Reaalprojekt OÜ and EstKonsult OÜ
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Tallinn, Ülemiste
- Beginning of the project:
- 2023
- Year of completion:
- 2027