Three apartment buildings will be completed as part of the second phase of the Õielehe residential quarter in the hamlet of Jüri outside Tallinn. The buildings in Õielehe are compact, cosy and compatible with families of various sizes. There will be a total of 33 apartments in the two-storey buildings, each with 2–5 rooms.
The buildings in Õielehe are energy class A and all apartments come with a balcony or a terrace. Courtyards with landscaping and recreational facilities and playgrounds are also part of the development. Parking spaces for residents’ cars are equipped with readiness for installation of electric vehicle charging points and there are solar panels on the apartment building rooftops. The apartments will also have readiness for adding a cooling system for additional comfort.
Õielehe is a functional living environment that feels cosy and intertwined with nature. The way the quarter’s buildings are spatially positioned creates a pleasant home environment for the residents. A nearby recreational trail and a Merko-established outdoor gym are an added plus.
Everything needed for a comfortable life can be found close by. Just a walk away from the homes at Õielehe are a number of schools and preschools – including one that Merko built, the Rae State Gymnasium – shops, places to eat and various sports facilities and cultural centres.
Ten apartment buildings and four row houses will be built in total and the quarter will be home to more than 140 families. The first two buildings were completed in spring 2025.
Visit merko.ee/oielehe for a closer look at the Õielehe homes.
- Client:
- OÜ Merko Kodud
- Name of the project:
- Õielehe residential development, stage II
- Category:
- Buildings
- Type of construction:
- Residential buildings
- Architect:
- Architectural bureau PIN Arhitektid
- Interior architect:
- Architectural bureau PIN Arhitektid
- Chief Designer:
- AS Merko Ehitus Eesti
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Õie str 6, 8 and 10, Jüri, Harjumaa
- Beginning of the project:
- 2026
- Year of completion:
- 2027


