Reconstruction of the “Aizkraukle” substation is going to include dismantlement of the existing 110 kV substation (six connections). To replace it, a new 110 kV substation is going to be built. The scope of works also provides for expansion of the existing 330 kV substation and installation of an autotransformer and a shunt reactor. Two more 330 kV connections will be built in order to connect these facilities to the existing 330 kV substation.
- Client:
- SIA K2 projekts
- Name of the project:
- Reconstruction and expansion of the Aizkraukle substation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Description of work:
- Reconstruction
- Country:
- Latvia
- Address:
- Tilta str 2, Aizkraukle
- Beginning of the project:
- 2016
- Year of completion:
- 2018