Reconstruction of Aloja 110/20 kV substation



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

The “Aloja” substation was built in 1973. Reconstruction works were carried out on the existing seven connections – sequential dismantlement and installation of new connections. The scope of reconstruction works includes the development of a complete technical design, construction of a control building, installation of 110 kV and 20 kV equipment, installation of substation relay protection and dispatching control systems.

The construction works were carried out by GP Merko Infra Remus Elektro.

Client:
Augstsprieguma tikls
Name of the project:
Reconstruction of Aloja 110/20 kV substation
Category:
Civil engineering
Type of construction:
Power infrastructure
Cooperation partner:
Remus Elektro
Chief Designer:
AS Merko Infra and SIA Karlis
Description of work:
Reconstruction
Country:
Latvia
Address:
Riga str 26, Aloja, Latvia
Beginning of the project:
2015
Year of completion:
2017