Renovation of switchgear of Paljassaare 110kV substation



Location

Status

Time of completion

Other


Buildings
Civil engineering
Concrete works

Construction of the substation took place in restricted spaces, near a working substation, and the entire substation was built on wedge-shape piles due to the complex geological soil conditions. The substation construction works included installation of 110 kV overhead power lines up to dead-end towers, and delivery and installation of a new 110 kV switchyard. New relay protections as well as automation and auxiliary voltage devices were installed in a newly built control building. A new auxiliary equipment building for Elektrilevi was also built and tied to an existing relay protection system.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Elering AS
Name of the project:
Renovation of switchgear of Paljassaare 110kV substation
Category:
Civil engineering
Type of construction:
Power infrastructure
Chief Designer:
AS Merko Infra and AS Merko Ehitus Eesti
Description of work:
Renovation
Country:
Estonia
Address:
Paljassaare, Tallinn
Beginning of the project:
2014
Year of completion:
2016