Wind farm foundations in Jonava I



Location

Status

Time of completion

Other


Buildings
Civil engineering
Concrete works

New-generation wind turbine foundations were established (mast height 151 m, 5.5 MW). CFA piles and CMC rigid inclusions were installed and concrete was poured for the foundation caps. Two pile foundations, two gravity foundations.

Client:
UAB Geotyrimų centras
Name of the project:
Wind farm foundations in Jonava I
Category:
Civil engineering
Type of construction:
Power infrastructure
Chief Designer:
UAB Energetikos projektavimo institutas
Description of work:
New building
Country:
Lithuania
Address:
Žeimių village, Jonava district
Beginning of the project:
2021
Year of completion:
2021