Ämari Air Base, reconstruction of electrical part of the movement area and runway lighting system



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

Lighting system and lighting for the terminal of the Nato airfield, 400Hz power system for aircraft, 10 kV substations.

Runway lighting system “CAT I +“ with operation for the runway with the length of 2,750 m.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Kaitseministeerium (Estonian Ministry of Defence)
Name of the project:
Ämari Air Base, reconstruction of electrical part of the movement area and runway lighting system
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
Reconstruction
Country:
Estonia
Address:
Ämari, Vasalemma, Harjumaa
Beginning of the project:
2008
Year of completion:
2009