The reason for building a new 330/110/20 kV substation in Aruküla was a fully depreciated old 220/110/10 kV substation. The old Aruküla substation was the only unrenovated substation powering Tallinn. It was a turnkey project which means that scope of the contract includes design work, delivery, installing and setup of all devices, adjustment works, etc., and that the substation must be handed over to the end-client in a fully working and energized state. The work comprised the installing of new 330/110/20 kV bay devices together with 110 kV overhead line works, and the const- ruction of new control and emergency systems. The new control system building got protection and emergency system computers. Also a new bore well, and sewerage and firewater fountain systems were established. The old 220 kV substation was demolished after the completion of new substation. Today the new Aruküla 330/110 kV substation provides electricity for nearly half of Tallinn, and a substantial part of electricity going to and coming from Estlink travels through Aruküla 330 kV systems.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- AS Elering
- Name of the project:
- Aruküla 300/110/20 kV substation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Järsi village, Raasiku, Harjumaa
- Beginning of the project:
- 2011
- Year of completion:
- 2013