The renovation of the 110/10kV substation in Sõmerpalu was occasioned by OÜ Osula Energia’s desire to connect to the power grid at 110kV voltage. As the old substation did not enable this, the entire 110 kV switchgear had to be renovated and a new control building built. The works took place in several stages as the new substation had to be built to replace the still operational old substation without posing inconvenience to consumers. Considering the fact that the delivery of key equipment took 6 months of time and the equipment had to be connected only 7 months after the signing of the contract, it was clear the first stage of the project would be extremely intense. Both first stage of the work and subsequent ones were delivered to the customer on time. By the end of the project, a modern substation with five 110kV cells was completed along with new control, auxiliary and control systems.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- Elering AS
- Name of the project:
- Connection of Osula Energia OÜ to Sõmerpalu substation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Chief Designer:
- AS Merko Inrfa and Raamprojekt OÜ
- Description of work:
- Renovation
- Country:
- Estonia
- Address:
- Sõmerpalu, Sõmerpalu parish, Võrumaa
- Beginning of the project:
- 2015
- Year of completion:
- 2016