Construction of electrical systems powering the oil shale and biofuel feeder systems
on the territory of Eesti Power Plant, including necessary equipment



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

State power company Eesti Energia wanted to establish a new power plant at Auvere, and in relation to this a fuel feeding system connected to the shale oil plant had to be built for the power plant. Lighting and low-voltage power supply systems were built for the fuel feeding system. The work also encompassed work to install and configure the systems for supplying power to the automated systems in the building and plant. Complexity stemmed from the need – due to the extremely critical schedule – to perform the electrical work simultaneously with the general construction.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Eesti Energia Tehnoloogiatööstus AS
Name of the project:
Construction of electrical systems powering the oil shale and biofuel feeder systems on the territory of Eesti Power Plant, including necessary equipment
Category:
Civil engineering
Type of construction:
Power infrastructure
Description of work:
New building
Country:
Estonia
Address:
Auvere, Ida-Virumaa
Beginning of the project:
2013
Year of completion:
2014