Under the contract, the E265/T-11 Tallinn roundabout from 24.9 to 29.6 km, i.e. from Kanama viaduct to Saku viaduct was reconstructed to 1st class road (2+2 lanes). In addition a new 3.35 km long section of Juuliku-Tabasalu connection road was constructed together with Juuliku two-level interchange. After completition of the new two-level interchange, the Jälgimäe one-level unsafety interchange E265/T-11 28.29 km was closed. During the construction, three viaducts and bridges were built.
The work was performed by a consortium consisting of AS Merko Ehitus Eesti, AS Merko Infra ja Tallinna Teede AS.
- Client:
- Maanteeamet (Estonian Road Administration)
- Name of the project:
- Construction of Juuliku road junction and road section at Tallinn roundabout
- Category:
- Civil engineering
- Type of construction:
- Transportation
- Cooperation partner:
- Tallinna Teede AS
- Description of work:
- Reconstruction; new building
- Country:
- Estonia
- Address:
- The E265/T-11 Tallinn roundabout from 24.9 to 29.6 km
- Beginning of the project:
- 2016
- Year of completion:
- 2017