Construction work on the passenger walkway at Vanasadama Harbour quay no. 5 and preparation of working project



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


The walkway is 270 m long, 5 m wide and 20.5 m high. One passageway and two ramps were built for passenger comfort, and an elevator was installed. The passenger walkway is a steel structure supported on shallow foundations, and covered on the outside with sandwich panels. Laminated and tinted security glass in aluminium frames is used for the windows.

Client:
AS Tallinna Sadam (Port of Tallinn)
Name of the project:
Construction work on the passenger walkway at Vanasadama Harbour quay no. 5 and preparation of working project
Category:
Civil engineering
Type of construction:
Port facilities
Cooperation partner:
APL Production AS
Description of work:
New building
Country:
Estonia
Address:
Sadama 25, Tallinn
Beginning of the project:
2016
Year of completion:
2017