Design and construction of the WS of the Alliku Village water management project



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


A water supply and wastewater collection system for the Alliku Village at the Saue Municipality were designed and constructed. The water supply is ensured by connecting it with the water pipeline constructed in the neighbouring village. The wastewater shall be collected with two pump stations, and it shall be pumped into a previously constructed pressurised wastewater system.

2.6 km of water pipeline, 0.8 km sewerage pipeline, 0.9 km of pressurized sewerage pipes, 2 wastewater pump stations

Client:
AS Kovek
Name of the project:
Design and construction of the WS of the Alliku Village water management project
Category:
Civil engineering
Type of construction:
Water and sewerage pipes, storm water drain lines
Designer:
Sweco Projekt AS
Description of work:
New building
Country:
Estonia
Address:
Alliku village, Saue rural municipality, Harjumaa
Beginning of the project:
2018
Year of completion:
2018