3.4 km of water pipelines, 4.2 km of sewerage pipelines, 1 waste water pumping station, 1 waste water treatment plant with output of 180 m³/day, 1 bore well pumping station with water treatment plant and level 2 pump station were designed and built. A bore well pumping station was renovated.
- Client:
- Viru-Nigula Vallavalitsus (Viru-Nigula Municipality Government)
- Name of the project:
- Design and construction work on the water supply and sewerage pipelines and infrastructure in the EU Cohesion Fund waste management project for the Viru-Nigula waste water intake area
- Category:
- Civil engineering
- Type of construction:
- Water and sewerage pipelines, storm water drain lines
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Viru-Nigula, Lääne-Virumaa
- Beginning of the project:
- 2012
- Year of completion:
- 2013