Electrical connection of Imavere wood fractionation pilot plant



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


Under the contract, a 15kV connection will be constructed for a new wood fractionation pilot plant. Delivery and installation of 15kV switchgear, two 15kV transformers and 0.4kV main switchgear.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Graanul Biotech OÜ
Name of the project:
Electrical connection of Imavere wood fractionation pilot plant
Category:
Energy supply
Type of construction:
Low- and medium voltage networks. Consumer and production installations, grid connections points
Designer:
AS Merko Infra
Description of work:
Reconstruction
Country:
Estonia
Address:
Imavere, Järvamaa
Beginning of the project:
2019
Year of completion:
2020