14 new generation power plants are planned with a total capacity of 79.8 MW, each with a capacity of 5.7 MW. The annual electricity production will reach about 266 GWh.
- Client:
- UAB Energijos Žara (Enefit Green)
- Name of the project:
- Electrical substation for a wind farm in Kelmė district
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Description of work:
- New building
- Country:
- Lithuania
- Address:
- Kelmė district
- Beginning of the project:
- 2023
- Year of completion:
- 2025