Construction of the electrical connection for the new CHP plant.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- Osula Energia OÜ
- Name of the project:
- Osula Energia cogeneration plant’s electrical installation
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Chief Designer:
- AS Merko Infra
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Varese village, Sõmerpalu rural municipality, Võru County
- Beginning of the project:
- 2016
- Year of completion:
- 2017