Reconstruction of the switchgear at Sindi 110kV substation



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


The Sindi substation’s 110 kV switchgear was renovated using the turnkey method. A 110 kV external switchgear installation with 8 capacity switches were built, connected to overhead lines, two voltage transformers and one OPT along with control, auxiliary and monitoring systems. A new control building was built. The old 110 kV switchgear installation was demolished.

Client:
Elering AS
Name of the project:
Reconstruction of the switchgear at Sindi 110kV substation
Category:
Energy supply
Type of construction:
Substations
Architect:
Jako Järvsaar (AS Merko Ehitus Eesti)
Designer:
AS Merko Infra
Description of work:
Reconstruction
Country:
Estonia
Address:
Urge village, Sauga rural municipality, Pärnu County
Beginning of the project:
2017
Year of completion:
2018