Renovation of the 35kV and 10kV switchgear for the Käina 35/10kV substation
and installation of ground current compensation equipment



Location

Status

Time of completion

Other


Buildings
Civil engineering
Concrete works

A new internal-type substation was built with 35 kV and 10 kV switchgear and automation equipment on the turnkey principle during the renovation of the Käina substation, and connections with the lines exiting the substation were rewired, earthing current compensation equipment was installed and substation access routes were built.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Elektrilevi OÜ
Name of the project:
Renovation of the 35kV and 10kV switchgear for the Käina 35/10kV substation and installation of ground current compensation equipment
Category:
Civil engineering
Type of construction:
Power infrastructure
Chief Designer:
AS Merko Infra and AS Merko Ehitus Eesti
Description of work:
Reconstruction
Country:
Estonia
Address:
Luguse village, Käina rural municipality Hiiu County
Beginning of the project:
2015
Year of completion:
2017