6.5 km of water supply and sewerage pipes were built, plus 10.7 km of the pressurized sewerage collector, which was built primarily using the enclosed method.
- Client:
- OÜ Sindi Vesi ja AS Sauga Varahaldus
- Name of the project:
- Renovation of the pressurized collector for Sindi-Pärnu and stage 1 of the construction of the water supply and sewerage pipelines for the village of Tammiste
- Category:
- Civil engineering
- Type of construction:
- Water and sewerage pipelines, storm water drain lines
- Description of work:
- Reconstruction
- Country:
- Estonia
- Address:
- Sindi-Pärnu, Pärnumaa
- Beginning of the project:
- 2010
- Year of completion:
- 2012