Renovation of the Vändra 110kV substation



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


In the course of the works, the Vändra 110kV substation was renovated using a turnkey method and including delivery of equipment along with the necessary design work, installation, configuration and inspections. The old switchgear was demolished and a new H-type 110kV external switchgear was established along with reconnections of lines, and new control, auxiliary and supervision system. In the course of the works, the access road was also renovated, and a new control building and 110kV switchgear were built.

Client:
Elering AS
Name of the project:
Renovation of the Vändra 110kV substation
Category:
Civil engineering
Type of construction:
Substations
Designer:
AS Merko Infra
Description of work:
New building; renovation
Country:
Estonia
Address:
J.V. Jannseni 9b, Vändra, Pärnumaa
Beginning of the project:
2017
Year of completion:
2018