14 wind turbines were planned. A contract has been signed with Merko statyba regarding both design and subcontracting, meaning that the company was responsible for both preparing the project and subcontracting. There were built substations for power transmission (transformer output 75 MW)
- Client:
- UAB Vėjo parkai (Enefit Green)
- Name of the project:
- Wind farm infrastructure facilities in Akmenė
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Architect:
- UAB ARCHSTUDIJA
- Chief Designer:
- Rūta Šeškaitė
- Description of work:
- New building
- Country:
- Lithuania
- Address:
- Kruopiai village, Akmenė district
- Beginning of the project:
- 2021
- Year of completion:
- 2022