Estonia
-
Õielehe residential development, stage II
Three apartment buildings and one row house will be completed as part of the second phase of the Õielehe residential quarter in the hamlet of Jüri outside Tallinn. The buildings in Õielehe are compact, cosy and compatible with families of various sizes. There will be a total of 33 apartments in the two-storey buildings, each …
-
Viktor Masing’s house
The Viktor Masing office building in Ülemiste City, Tallinn, consists of two thirteen-story towers connected to each other up to the ninth floor. The office building meets the highest environmental standards: it has an A energy rating, district heating and cooling, and a 150 kW solar panel system. The building is applying for LEED Gold …
-
Leedri homes
The Leedri residential quarter is located in Raadi, on the border between the City of Tartu and Tartu Municipality. In total, six apartment buildings with 144 apartments will be constructed in the quarter. As the first stage of the Leedri Homes development, two apartment buildings will be completed at Leedripuu 1 and Leedripuu 2. The …
-
Hotel and entertainment and conference centre
A new complex consisting of two buildings and a beach club area will be completed in the first row on the seafront, boasting 23,000 square metres of gross space: a spa hotel with 210 guest rooms and a 7000-square-metre conference centre that in addition to the event venue has 16 additional guest apartments. Both buildings …
-
Lahekalda apartment buildings, stage VI
Two apartment buildings with a total of 110 apartments will be completed as part of the six stage of the Lahekalda development. The residential buildings at Paekalda 15 and 17 are 8-storey A-energy class buildings with windows offering views of Tallinn Bay and the city skyline or the beautiful surrounding nature. The apartments under construction …
-
Rail Baltica Ülemiste passenger terminal
The terminal building will be perpendicular to Suur-Sõjamäe Street, the Rail Baltica line and Eesti Raudtee’s (Estonian Railway) eastbound railway infrastructure, rising to a maximum of 20 meters – about six storeys high. The central part of the building is 180 meters long, with pedestrian tunnels and utility networks to run beneath it. Three platforms …
-
Rail Baltica railway between Tallinn and Pärnu
The 142-kilometre section of the Estonian part of the Rail Baltica between Tallinn and Pärnu will be built in close cooperation between the contracting authority, the contractor and the designer, in accordance with the principles of alliance procurement. The scope of works includes the main construction of the main railway line on the section between …
-
Noblessner development – Allveelaeva 2 residential and business building
The Allveelaeva 2 residential and commercial building is being built near the Noblessner marina, next to the Allveelaeva 4 building. The new building is planned to have 83 apartments and 6 commercial spaces. The homes here have higher than average ceilings and floor-to-ceiling windows, and the apartments on the upper floors have spacious roof terraces. …
-
Kullo Leisure Centre
The contract covers the demolition of the old building and establishment of a new four-storey structure with approximately 12,000 m² of net area along with part of the design work and furnishings. This is a very important building for the district of Kristiine, which besides providing a venue for avocational education will allow for greater …
-
Tartu joint building of national defense institutions
The Tartu joint building of national defense institutions, to be built in Raadi, Tartu, is intended for units operating under the jurisdiction of the Ministry of Defense, primarily the Defense Forces, the Defense Resources Agency, and the National Defense Investment Center. The new building will have 100 workplaces, meeting rooms, and 210 barracks-style accommodation units. …