• Business and office building on the Tartu mnt 1 (City Plaza 2)

    A 101-metre-high building with 28 aboveground storeys and two underground levels will be erected on the former site of the Estonian Academy of Arts. Named City Plaza 2, the complex will also have lower parts – a six-storey structure with office and commercial space on the corner of Gonsiori and A. Laikmaa streets and a …


  • Veerenni apartment buildings, stage VI

    There are 63 apartments in the eight-storey energy Class A building, which is being built as the sixth stage of the Uus-Veerenni development and is the tallest building in the residential quarter so far. The 2- to 5-bedroom homes for families of different sizes range from 35 to 115 square metres. All the Tiiu 14 …


  • Erminurme apartment buildings, stage V

    During the fifth stage of the Erminurme apartment development project, two three-story apartment buildings with a total of 36 apartments were completed. The two- to four-room apartments in the A-energy class buildings range in size from 48 to 91 square meters. In order to meet customer demands, smaller three-room apartments were also added to the …


  • Õielehe residential development, stage I

    The first two apartment buildings in Õielehe residential quarter were completed in spring 2025 at Õie 2 and Õie 4. The two-storey energy class A structures have 22 apartments and the sizes of the 2–5-room units are 50–102 square metres. All apartments have a terrace or balcony and readiness for the addition of a cooling …


  • Barracks at the Ämari base

    According to the contract AS Merko Ehitus Eesti constructed three new housing facilities on the Ämari base. We were also establishing utility networks that will allow the Estonian Centre for Defence Investments (RKIK) to plan other buildings there in future. In the barracks with a total area of approximately 15,000 square metres, conscripts’ housing facilities, …


  • Logistics centre at Paemurru 1

    AS Merko Ehitus Eesti built the logistics centre, including the roads, loading and parking areas and external utilities. The building was built in accordance with the requirements of the BREEAM Excellent certificate. The completed logistics centre serves the goods volumes of TKM Group companies. The total area of the centre is 17,200 square meters.


  • Hyatt Place Hotel and the Ankru Office Building

    The building at Sadama 4 houses the first hotel in the Baltic States to meet Hyatt standards, as well as the Ankru office building. The developers of the complex are Estma HPT, Nordox, and Wingmacht Arendus. The building, with a gross area of nearly 15,000 square meters, was built by Merko. The building’s architecture was …


  • Construction works of Rail Baltica’s Ülemiste terminal railway facilities

    The contract covers construction on the load-bearing structures underlying the railway at the Ülemiste joint terminal, which will be called the Linda terminal after a mythological character. In this phase, the concrete part of the underground level of the terminal and other necessary buried utility lines needed for the railway infrastructure will be completed. The …