Estonia
-
Construction works of North Estonia Medical Centre
C-block has five storeys, with a gross area of 27,529 m². The first stage of the work, approx. 16,000 m², was completed in August 2014; the second stage in March 2016. The architectural design of the renovation was developed by Arhitektuuribüroo Pluss OÜ, the author being architect Indrek Suigusaar. The interior design was by interior …
-
Weak current installations of the renovated buildings of the
North Estonia Medical Centre Mustamäe facilitiesThe renovated hospital blocks’ data networks, telephone and information transmission systems, video surveillance systems and external video cameras.
-
-
-
-
-
Water and sewerage pipelines of the city Jõgeva
3,817 m of water pipelines, DN40-DN110 7,735 m of sewerage pipelines, DN160-DN315 740 m of storm water sewerage pipelines, DN200-DN560
-
-
1st quay of the South Port of Paldiski
The reconstruction project of the first quay consisted of the building of stakes, concrete constructions, passage bridges, attributes of the port and cathode protection. The construction process was challenging, as in December, 2002 both the port and the surrounding sea area were attacked by flat ice. After the frosts were over, the builders’ team was …
-