Estonia
-
-
Extension of the Smuuli road
The viaduct of Smuuli road connects Smuuli road from Peterburi road up to Suur-Sõjamäe street. The viaduct with the length of 370 m was built over the railways first in Estonia as the guy bridge within 170 m and as the five-opening girder bridge within 200 metres. The width of the lanes of the viaduct …
-
II stage of expansion of Valga water and sewerage network
21.9 km of water pipelines 19.3 km of sewerage pipelines including using the closed method Ø500/450 – 470 m 4.3 km of storm sewerage pipelines 3 waste water pumping stations, each one 5 l/s (18 m³/h) Red Book FIDIC contract terms
-
Port of Saaremaa
In June 2006 Merko Ehitus finished construction works of the Port of Saaremaa with three quays, located in Saaremaa, Mustjala township. There are two quays in the Port of Saaremaa for servicing vessels with a length of up to 200 meters, one quay for servicing the port’s auxiliary fleet and a floating quay for servicing …
-
Viaduct of Veose/Vilja street
The overpass between Veose and Vilja street won the special construction prize at the competition Concrete Building of the Year 2006.
-
-
Puurmani junction
The construction of Puurmani junction, which was ordered by the Estonian Road Administration to make the Tallinn-Tartu-Võru-Luhamaa road safer. During the first stage of the project in November 2006, a twolaned arc bridge of 90 meters was built over the Pedja River to replace the old narrow bridge. The Puurmani arc bridge was awarded the …
-
-
-