Estonia
-
Renovation and expansion of the city of Tõrva’s water and sewerage systems. Part 1: City of Tõrva (area around the left bank of the River Õhne and city centre)
Thanks to the construction, now all Tõrva residents have high-quality drinking water and can direct waste water into the treatment plants via the public sewerage system. Replacement of the pipeline gave 1,175 residents of Tõrva the possibility of joining the public water supply system; 1,296 residents are able to connect to the public sewerage system. …
-
Elva waste water treatment plant
A new environmentally friendly waste water treatment centre will make it possible for more than 6,000 residents of the city of Elva and small town of Käärdi to join a modern waste water treatment centre. The new centre will treat waste water from the entire area and handle waste water sediments, which will result in …
-
-
Design and construction work on the water and sewerage pipelines as part of Vinni municipality water management project. Vinni and Pajusti
As part of the project, a total of 4.6 km of water pipelines, 0.7 km of sewerage pipelines, and 1 waste water pumping station were built.
-
Renovation and expansion of the public water works and sewerage systems of the city of Põltsamaa and environs, stage II. Design and construction work Part 1: Water and sewerage pipelines
9 km of water pipelines, 18.5 km of sewerage pipelines, 7.6 km of non-pressurized sewerage pipelines and 1.6 km of pressurized sewerage pipelines, and 6 waste water pumping stations were designed and built.
-
Construction work on restoration of the city of Valga’s water and storm water and sewerage pipelines and renovation of pavements: Part 4
As a result of the project, 3.6 km of water pipelines, 2.6 km of waste water pipelines and 1.3 km of storm water pipelines were built or reconstructed. Two new waste water pumping stations were built and about 700 m of Kungla Street was reconstructed to full width, laying 2,667 m of kerb, 3,700 m² …
-
Construction work on restoration of the city of Valga’s water and storm water and sewerage pipelines and renovation of pavements: Part 2
As a result of the project, 3.6 km of water pipelines, 2.6 km of waste water pipelines and 1.3 km of storm water pipelines were built or reconstructed. Two new waste water pumping stations were built and about 700 metres of Kungla Street was reconstructed to full width, laying 2,667 metres of kerb, 3,700 sq. …
-
Construction on the Aia Street promenade of the Narva-Jõesuu beach area, including design and construction of the street lighting
AS Merko Infra and AS Merko Ehitus perform design and construction work on Aia tänav promenade in the beach area of the city of Narva-Jõesuu. In the course of the renovation of a 1.2 km segment of Aia tänav, a new, fully compliant roadway with an asphalt concrete surface were designed and built, flanked by a …
-
Construction works of water and sewerage utility lines of Vääna-Jõesuu: Part 4
Merko has completed the fourth and final phase of construction of Vääna-Jõesuu’s public water supply and sewerage piping as well as waste water pumping stations. A vacuum station and waste water pumping station were built in the Puraviku tee and Nõmmerohu tee area, as well as 3.8 km of drinking water pipelines and 4.1 km …
-
Design and construction work for the renovation and expansion of the Narva-Jõesuu public water supply and sewerage pipelines: Part 1
About 22 km of pipes; 2 wastewater pumps station