• Reconstruction of Kiisa 330kV substation

    Under the agreement, part of the Kiisa 330kV substation property will be cleared from equipment and buildings to make room for a future synchronous condenser, which is an important part of ensuring the security of supply of the Estonian power grid after disconnecting it from the Russian network. The necessary preparations are being made for …


  • Extension of Aia Street in Kuressaare

    Under the agreement, the existing Aia Street was extended to Lootsi Street. A sidewalk, street lighting, stormwater drainage and a bridge over the Tori River was built on the new 800-metre section of the street. In addition, a bridge over the Põduste River was reconstructed on Lootsi Street and a new pedestrian bridge was built.


  • Reconstruction of the Nordic Hotel Forum

    After renovation, the four-star superior business and conference hotel has 258 hotel rooms instead of the previous 267 rooms. The renovation project was designed by interior architects Kaire Kemp-Tišler and Ea Andla from the Artaku Interior Architecture firm. Furniture specially commissioned from Estonian designers was used to furnish the hotel. The ventilation and other technical …


  • Reconstruction of the Tallink City Hotel

    The former House of Service on Laikmaa Street from 1974 was turned into a hotel in 2004, and the renovated Tallink City Hotel was opened to visitors in the summer of 2021. After the renovations, the ten floors of the hotel will accommodate 324 rooms of various categories – classic twin rooms, spacious rooms for families, …


  • Pikaliiva apartment buildings, stage IV

    The fourth phase of the Pikaliiva development two 4-storey residential buildings with a total of 50 apartments were completed next to Lake Harku, surrounded by greenery. Merko’s Pikaliiva Quarter features cosy apartments with well-designed floor plans and child friendly interior courtyards. The apartment buildings in Pikaliiva are energy class B. The buildings have economical hydronic …


  • Y Block of the North Estonia Medical Centre (NEMC)

    A 14,500 m2 Y-block was built at the Mustamäe hospital complex, which is the NEMC’s centre for modern, patient-friendly oncological care for cancer patients. An outpatient chemotherapy department, inpatient chemotherapy, hematology departments, house the Nephrology Centre’s hemodialysis department and the nephrology inpatient department, which require enhanced environmental technical solutions, are located in the Y-block. The …


  • Concrete works for the Saustinõmme viaduct

    During the reconstruction of the 20.2–24.2 kilometre stretch of the Tallinn Ring Road, the Luige-Saku road section, two 112-metre-long viaducts were built as the first objects of the future Rail Baltica route. The support height of the formwork is 9 m above ground, the height of the concrete deck slab is 1.4 m and the volume of …