Estonia
-
Concrete works for the Töökoja 1 business and medical centre
Construction of a monolithic underground car park in an eight-storey building. The volume of monolithic concrete used is 1,340 m3.
-
Concrete works for the Toom-Kuninga 15 apartment building
Construction of an underground two-storey part of an apartment building developed by Metro Capital and divided into four units and assembly of the building frame for the four above-ground units. The volume of monolithic concrete used is 3,246 m3. Photos: Andrés Gallardo Albajar
-
Concrete works for Kadrioru Plaza
Construction of the building frame for a nine-storey residential and business complex. The volume of monolithic concrete used is 8,868 m3.
-
Concrete works for the Tobias apartment buildings
Construction of a two-storey monolithic underground part connecting three apartment buildings and construction of the floors of the underground car park. The volume of monolithic concrete used is 6,965 m3 and the floor area is 3,500 m2.
-
Concrete works for Harju County Court’s new court house
Construction of the monolithic part of the frame of Harju County Court’s new building. The volume of monolithic concrete used is 4,564 m3.
-
Concrete works for the Sepise 8 commercial building
Construction of a frame for an office building. The volume of monolithic concrete used is 143 m3.
-
Concrete works for Novira Plaza
Construction of a monolithic frame for an office and residential building. The volume of monolithic concrete used in the construction of posts, ceilings, stairwells and floors is 3,850 m3.
-
Concrete work for the Lelle 22 office building
Construction of the frame of a 14-storey office building. The volume of monolithic concrete used is 3,293 m3.
-
Expansion of production facility at an industrial depot
In the course of the expansion of the production building, a production building along with new warehouse space, non-work areas and utility rooms were built at Merrem Tööstusplast in Tartu. Socket foundations were built and a frame with steel posts and girders were erected. Reinforced concrete panels were installed in the building’s base, and sandwich …
-
Engineering design and construction of the infrastructure for the land part
of the Republic of Estonia’s south-eastern border, stage IIn the scope of the contract, infrastructure was built along a 23.5 km segment of the border in Võru County which starts at the tri-country border point between Estonia, Latvia and Russia and ends on the southern shore of Lake Vanigõjärv in Tserebi village 3.5 km north of Luhamaa border checkpoint. Technically and in terms …