Construction of Kiisa substation 10kV, 110kV and 330kV connection points



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


The goal of the expansion of the 330/220/110/35/10kV Kiisa substation, fully renovated in 2010, was to establish connections for the new 250 MW Kiisa emergency power plant. The contract called for one 330kV duplex cell, one 110kV simplex cell and two 10kV local power plant cells to be designed and constructed. The new power plant will start to feed the Estonian power grid at a 140 MW capacity through the 330kV cell and the 110kV cell will feed the grid at 110 MW capacity. The construction work took place in a substation with live equipment, due to which great emphasis was placed on planning the work and worker safety. The cell construction work included earth moving, laying foundations and subframes for the equipment, installation of equipment, connecting of cables and configuration and connections with the existing substation. Two separate 12 m² lightweight panel buildings along with cable basements were built for the plant’s own 10kV equipment.

Client:
AS Elering
Name of the project:
Construction of Kiisa substation 10kV, 110kV and 330kV connection points
Category:
Energy supply
Type of construction:
Substations
Description of work:
Reconstruction
Country:
Estonia
Address:
Tõdva village, Saku, Harjumaa
Beginning of the project:
2012
Year of completion:
2013