Installation of cableways for cables exiting the turbine hall on pipe gantries. Installation of medium-voltage transformers and switchgear, cable connections and cable ducts in the turbine hall. General power supply and low-voltage switchgear and cableways for technological equipment, UPS power, guaranteed power grid, 110 VDC power. Completion of the earthing system between turbine hall and buildings.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Eesti Energia Õlitööstus AS (Eesti Energia Oil Industry)
Name of the project:
Enefit-280 internal installation works
Category:
Energy supply
Type of construction:
Low- and medium voltage networks. Consumer and production installations, grid connections points
Designer:
Eldeco OÜ, AF Consult LTD
Description of work:
New building
Country:
Estonia
Address:
Auvere village, Vaivara, Ida-Virumaa
Beginning of the project:
2011
Year of completion:
2012