Within the context of works, the 10.5kV power systems of Mustamäe combined heat and power plant (CHP) were built and connected to the existing boiler plant’s 6kV substation and Elektrilevi 10kV network. The thermal power of the new combined heat and power plant is 2×24 MW and electric power ca 10MW.
On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.
View the works performed by Connecto.
- Client:
- AS Utilitas Tallinn
- Name of the project:
- Engineering works and construction of the power systems of the Mustamäe combined heat and power plant (CHP)
- Category:
- Civil engineering
- Type of construction:
- Power infrastructure
- Chief Designer:
- AS Merko Infra
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Kadaka road 181, Tallinn
- Beginning of the project:
- 2018
- Year of completion:
- 2019