Jäneda 110kV substation



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


The contract includes the construction of a 110kV switchgear in Jäneda‘s new substation together with auxiliary and control systems. Works include the construction of a control building, bays for autotransformers and reconstruction of access roads. Two line input connections from the Tapa–Aruküla 110kV overhead line shall be connected to new switchyard, for which reason two new iron-frame terminal towers shall be installed in the vicinity of the substation.

Client:
Elering AS
Name of the project:
Jäneda 110kV substation
Category:
Civil engineering
Type of construction:
Substations
Designer:
AS Merko Infra and Sevecon OÜ
Description of work:
New building
Country:
Estonia
Address:
Jäneda village, Tapa rural municipality, Lääne-Virumaa
Beginning of the project:
2019
Year of completion:
2020