The contract includes the construction of a 110kV switchgear in Jäneda‘s new substation together with auxiliary and control systems. Works include the construction of a control building, bays for autotransformers and reconstruction of access roads.
Two line input connections from the Tapa–Aruküla 110kV overhead line shall be connected to new switchyard, for which reason two new iron-frame terminal towers shall be installed in the vicinity of the substation.
- Client:
- Elering AS
- Name of the project:
- Jäneda 110kV substation
- Category:
- Energy supply
- Type of construction:
- Substations
- Designer:
- AS Merko Infra and Sevecon OÜ
- Description of work:
- New building
- Country:
- Estonia
- Address:
- Jäneda village, Tapa rural municipality, Lääne-Virumaa
- Beginning of the project:
- 2019
- Year of completion:
- 2020