Power supply for Enefit’s turbine hall



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


Eesti Energia Õlitööstus is building a new oil plant based on Enefit280 technology that is going to be environmentally friendlier, more reliable and more powerful. The new generation technology used was developed as a joint venture by Eesti Energia and the international engineering company Outotec.

The works comprised the construction of support systems for cables inside the turbine hall and cables going out of the hall; and the installing of power, control and signal cables, a UPS power network and a 110 VDC power network with all the related busway lines and cable connections. Medium voltage transformers and low voltage switchgear for general power supply and the technological process were installed. A wide earthing system was built around the turbine hall.

Client:
Eesti Energia Õlitööstus AS (Eesti Energia Oil Industry)
Name of the project:
Power supply for Enefit’s turbine hall
Category:
Civil engineering
Type of construction:
Low- and medium voltage networks. Consumer and production installations, grid connections points
Designer:
Joala Elekter OÜ
Description of work:
New building
Country:
Estonia
Address:
Auvere village, Vaivara, Ida-Virumaa
Beginning of the project:
2012
Year of completion:
2012