Reconstruction of Mõniste 110/35/10kV substation



Location

Description of work

Other

Status

Time of completion


Buildings
Civil engineering
Concrete works

Merko Infra complete the reconstruction of Mõniste 110/35/10kv substation. Works included design, construction and installation work of the substation as well as installation and configuration of secondary equipment. A new switchgear building was erected, in which a new two-sectioned 10kV switchgear and an arc-suppression coil were installed. A 35kV switchgear was installed on the substation‘s territory. Outgoing 35kV and 10kV feeder cables were installed and connected to the power grid.

On 1 July 2021, Merko Ehitus Eesti acquired a stake in Connecto Eesti, and the Merko electrical construction business line merged with Connecto. Acting jointly under the Connecto brand makes it possible for us to offer a significantly broader range of services – in addition to the design, construction and maintenance of low, medium and high voltage electricity networks, Connecto also operates in the field of telecommunications and gas networks.

View the works performed by Connecto.

Client:
Elektrilevi OÜ
Name of the project:
Reconstruction of Mõniste 110/35/10kV substation
Category:
Civil engineering
Type of construction:
Power infrastructure
Chief Designer:
AS Merko Infra
Description of work:
Reconstruction
Country:
Estonia
Address:
Hürova village, Mõniste rural municipality, Võru County
Beginning of the project:
2017
Year of completion:
2018