Reconstruction of Saare 110kV substation



Buildings

Civil engineering

Energy supply

Concrete works


Location

Description of work

 

 

 


The renovation of the 110 kV substation at Saare between Tartu and Mustvee allows Elering to ensure the reliability of supply in the southern region of Estonia’s electrical system. Under a turnkey design and building contract, a new H-configured 110 kV switchgear installation with three capacity switches and a control building with cable cellar were built in place of the old decommissioned Saare substation. Two overhead lines and the power transformer were connected to the switchgear and the transformer was moved onto a new basin foundation. The substation equipment was integrated with the control, auxiliary and verification systems. The design allows the Saare substation to be expanded in future if it should prove necessary to meet demand from existing or new power consumers.

Client:
Elering AS
Name of the project:
Reconstruction of Saare 110kV substation
Category:
Civil engineering
Type of construction:
Substations
Designer:
AS Merko Infra
Description of work:
Reconstruction
Country:
Estonia
Address:
Saarjärve village, Saare rural municipality, Jõgeva County
Beginning of the project:
2016
Year of completion:
2017